Champlain Oil Company
Trudell Consulting Engineers (TCE) has established a working relationship
with Champlain Oil Company that dates back to 1999. Since then,
TCE has worked on seven commercial projects for Champlain Oil Company.
Most recently, TCE has completed an on-site replacement sanitary
design for the company in New Haven, located and Vermont Routes
7 and 17, redesigning the wastewater system to include new septic
tanks, a pre-treatment system, a pump station, and a mound system
for disposal. The wastewater system is designed for 1,600 gallons
per day and TCE proposed the mound system be located on the frontage
of Vermont Route 17, so as its appearance would be that of a low
earthen berm.
TCE has also provided Champlain Oil with a traffic study for impending
store and deli expansions in Quechee, at US Route 4, the Hartland
– Quechee intersection. Champlain Oil Company relied on TCE
for additional traffic study for the reconstruction of the 110 Kennedy
Drive Mobil convenience store to include a deli.
|